{"id":2073,"date":"2024-09-23T06:55:03","date_gmt":"2024-09-23T06:55:03","guid":{"rendered":"https:\/\/euroengineering.net\/ypiresies\/"},"modified":"2024-10-21T18:13:12","modified_gmt":"2024-10-21T18:13:12","slug":"ypiresies","status":"publish","type":"page","link":"https:\/\/euroengineering.net\/en\/ypiresies\/","title":{"rendered":"Services"},"content":{"rendered":"\n<div class=\"wp-block-uagb-container uagb-block-6803eae3 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-advanced-heading uagb-block-a2f9964e\"><h1 class=\"uagb-heading-text\">Cadastral Services<\/h1><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-fnaacu6h alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-info-box uagb-block-40d91fef uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top wp-block-uagb-info-box--has-margin\"><div class=\"uagb-infobox-margin-wrapper\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h1 class=\"uagb-ifb-title-prefix\">01<\/h1><h2 class=\"uagb-ifb-title\">CADASTER<\/h2><\/div><p class=\"uagb-ifb-desc\">The National Cadastre is a major developmental and technologically advanced project that records and protects private and public property with evidentiary force. It introduces innovations that make it a truly fundamental project for Greece, generating significant benefits for citizens, the national economy, and environmental protection.<br>It proceeds to the definitive, unquestioned recording and securing of citizens&#8217; property rights.<br>It reduces bureaucracy through simpler and faster processes for transferring real estate.<br>It enhances transparency and security in real estate transactions.<br>It upgrades the real estate market and increases the value of real property, consequently attracting significant investments.<br>It irrevocably delineates and fully secures public and municipal property.<br>It protects the environment more effectively.<\/p><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-uagb-container uagb-block-c7706dba\">\n<div class=\"wp-block-uagb-container uagb-block-31a59e47\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div>The irrevocable delimitation of forests and coastal areas will constitute the most significant barrier against encroachments and illegality.<\/div>\n<ul>\n<li>It constitutes an essential tool for the rational organization and development of the country.<\/li>\n<\/ul>\n<div>At the same time, the Cadastre records the location and geometric details of parcels of land (plots, agricultural lands, private pastures and forest parcels, public communal and common areas, roads, squares, etc.), as well as buildings, real property rights and beneficiaries, the method of acquisition of each right, and it also manages the real property rights over the assets.<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-uagb-image uagb-block-440c9863 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/ktimatologiolarge._2908.jpg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/ktimatologiolarge._2908.jpg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/ktimatologiolarge._2908.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/ktimatologiolarge._2908.jpg\" alt=\"\" class=\"uag-image-1843\" width=\"580\" height=\"362\" title=\"ktimatologio(large)._2908\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-893265c4\">\n<ul>\n<li><strong>PROPERTY REGISTRATION STATEMENT<\/strong><\/li>\n<\/ul>\n<div>The registration of your properties in the Cadastral Office can be done through our office to secure your ownership and to avoid future inconvenience and unnecessary costs related to any objections and legal appeals, due to incorrect or incomplete declarations.<\/p>\n<p><strong>Required documents for the Cadastral Declaration:<\/strong><\/p>\n<p><strong>1. Title deeds <br \/>2. Registration certificates<br \/>3. Copy of identification<br \/>4. Proof of Tax Identification Number (any official document or utility bill)<br \/>5. Authorization<br \/>6. Topographic Map with coordinates in the E.G.S.A. &#8217;87 system<\/strong><\/p>\n<p>The Topographic Diagram with coordinates in the National Reference System EGS\u201987 ensures the accurate registration of your property by the Cadastre. With low cost at this stage, you can save multiple amounts of money in the future and avoid potential distress without a positive outcome in order to correct any errors after the completion of the Land Surveying Study.<br \/>Owners who have real rights over properties must submit a relevant declaration to the Cadastral Offices.<br \/>On July 23, 2018, the submission of Property Declarations under the Law began. 2308\/95 for the establishment of the National Cadastre in the former Kapodistrian Communities of Varnava, Grammatiko, Kalamos, Kapandriti, Markopoulo Oropos, Nea Palatia, Skala Oropos, Sycamino, and Oropos in the Regional Unit of Eastern Attica of the Region of Attica.<br \/>The deadline for submitting declarations for residents within the country is three months (23\/10\/2018), while for residents abroad it is six months (23\/01\/2019).<br \/>In both cases, the submission of a declaration is mandatory. If no declaration is submitted or if the information submitted does not sufficiently prove the acquisition of rights over the property, the right will not be registered in the &#8220;First Registrations&#8221; and\/or &#8220;Final Registrations&#8221; of the Cadastre.<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-566de2de\">\n<figure class=\"wp-block-gallery has-nested-images columns-default wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"411\" height=\"580\" data-id=\"1853\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_1_3148.png\" alt=\"\" class=\"wp-image-1853\" srcset=\"https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_1_3148.png 411w, https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_1_3148-213x300.png 213w\" sizes=\"auto, (max-width: 411px) 100vw, 411px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"411\" height=\"580\" data-id=\"1854\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_2_9379.png\" alt=\"\" class=\"wp-image-1854\" srcset=\"https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_2_9379.png 411w, https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_2_9379-213x300.png 213w\" sizes=\"auto, (max-width: 411px) 100vw, 411px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full is-style-default\"><img loading=\"lazy\" decoding=\"async\" width=\"411\" height=\"580\" data-id=\"1855\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_3_1858.png\" alt=\"\" class=\"wp-image-1855\" srcset=\"https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_3_1858.png 411w, https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/d1open_page_3_1858-213x300.png 213w\" sizes=\"auto, (max-width: 411px) 100vw, 411px\" \/><\/figure>\n<\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-ebb455d8\">\n<ul>\n<li><strong>SUBMISSION OF OBJECTIONS<\/strong><\/li>\n<\/ul>\n<div>After the collection and processing of the property declarations and their analysis, the Posting of the Cadastre follows, during which the results of the processing relating to the properties declared by the owners are sent to them. Owners have a 2-month period to check the details sent to them and if they have any objections, they may submit an appeal. The objection may concern either an obvious error, such as the incorrect registration of their details, or more serious issues such as the erroneous recording of the boundaries of their property, or even more severe issues such as their non-recognition as beneficiaries of the property for which they submitted a declaration.<br \/>Our team can take charge of reviewing the information from the posting and advise you on any necessary further actions to secure your rights.<\/div>\n<ul>\n<li><strong> PROPERTY IDENTIFICATION \u2013 TITLE \/ DEED APPLICATION<\/strong><\/li>\n<\/ul>\n<div>The experience, combined with the expertise and systematic study of our personnel, facilitates the achievement of an indisputable and accurate declaration of ownership in the National Land Registry during the land registration phase, while simultaneously avoiding disputes with neighboring owners.<br \/>With our modern surveying equipment, we are capable of responsibly determining the boundaries of your property, which is usually carried out through the following steps:<\/div>\n<ul>\n<li>Study of property titles and any old diagrams of the property, records from public services, and older aerial photographs of the area, aimed at a preliminary assessment of the location of the property boundaries.<\/li>\n<li>Outdoor inspection and topographic documentation of the established boundaries and evidence of the property area (stakes, fences, dry stone walls, walls, etc.), which are taken into account in the final calculation.<\/li>\n<li>Calculation of the boundaries described in the titles and their application and marking on the ground.<\/li>\n<\/ul>\n<ul>\n<li><strong>USUCAPTION<\/strong><\/li>\n<\/ul>\n<div>In the case where there are no property titles and the property is possessed through usucaption, a dependent topographic diagram is prepared based on the boundaries of the cultivation and the possession of the property. These diagrams are submitted to the land registry office during the phase of property declarations, aiming to clearly and indisputably record the boundaries of rights, without errors that lead to correction procedures in the future.<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-separator uagb-block-aaf3e80e wp-block-uagb-separator--icon\"><div class=\"uagb-separator-spacing-wrapper\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><div class=\"wp-block-uagb-separator-element\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path d=\"M380.6 365.6C401.1 379.9 416 404.3 416 432C416 476.2 380.2 512 336 512C291.8 512 256 476.2 256 432C256 423.6 257.3 415.4 259.7 407.8L114.1 280.4C103.8 285.3 92.21 288 80 288C35.82 288 0 252.2 0 208C0 163.8 35.82 128 80 128C101.9 128 121.7 136.8 136.2 151.1L320 77.52C321.3 34.48 356.6 0 400 0C444.2 0 480 35.82 480 80C480 117.9 453.7 149.6 418.4 157.9L380.6 365.6zM156.3 232.2L301.9 359.6C306.9 357.3 312.1 355.4 317.6 354.1L355.4 146.4C351.2 143.6 347.4 140.4 343.8 136.9L159.1 210.5C159.7 218 158.5 225.3 156.3 232.2V232.2z\"><\/path><\/svg><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-info-box uagb-block-4bacd56f uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top wp-block-uagb-info-box--has-margin\"><div class=\"uagb-infobox-margin-wrapper\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h1 class=\"uagb-ifb-title-prefix\">02<\/h1><h2 class=\"uagb-ifb-title\">TOPOGRAPHIC STUDIES<\/h2><\/div><p class=\"uagb-ifb-desc\"><strong><u>TOPOGRAPHIC DIAGRAM<\/u><\/strong><br>Our office, based on the extensive experience of our engineers, specializes in the preparation of dependent topographic diagrams within the EGS\u0391 &#8217;87 system, intended for use in land registries, as well as for property transfers and the issuance of building permits. Both during the Declaration phase and during the phase of temporary posting of land registry data, if erroneous entries are identified (e.g., incorrect area and boundaries of the property, incorrect location, submission of objections, etc.), we undertake the preparation of topographic diagrams in the EGS\u039187 system, which accurately describe the required corrections that need to be implemented. These diagrams accompany the correction requests and lead to corrected entries that correspond to the property ownership titles.<br><br> <strong><u>PHOTOINTERPRETATION<\/u><\/strong><br><br>Our office has significant experience in the field of photointerpretation. Photointerpretation studies are conducted by specialized surveyors with many years of experience in photointerpretation, remote sensing, and photogrammetry.<br>The photointerpretation study serves as a significant piece of evidence that can provide information for a specific area and specific date or comparatively and combinatorially for various dates.<br>Indicatively, a photointerpretation study can be used for:<br>Objections to the draft forest maps.<br>Identification of property.<br>Documentation of property boundaries and potential changes due to encroachments.<br>Application of Titles.<\/p><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:10%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:80%\">\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"558\" height=\"580\" data-id=\"1877\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia-22.jp_5876.jpg\" alt=\"\" class=\"wp-image-1877\" srcset=\"https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia-22.jp_5876.jpg 558w, https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia-22.jp_5876-289x300.jpg 289w\" sizes=\"auto, (max-width: 558px) 100vw, 558px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"549\" height=\"580\" data-id=\"1876\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/65340_9727.jpg\" alt=\"\" class=\"wp-image-1876\" srcset=\"https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/65340_9727.jpg 549w, https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/65340_9727-284x300.jpg 284w\" sizes=\"auto, (max-width: 549px) 100vw, 549px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"580\" height=\"406\" data-id=\"1881\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia-21.jp_7558.jpg\" alt=\"\" class=\"wp-image-1881\" srcset=\"https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia-21.jp_7558.jpg 580w, https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia-21.jp_7558-300x210.jpg 300w\" sizes=\"auto, (max-width: 580px) 100vw, 580px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"580\" height=\"370\" data-id=\"1880\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia_4294.jpg\" alt=\"\" class=\"wp-image-1880\" srcset=\"https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia_4294.jpg 580w, https:\/\/euroengineering.net\/wp-content\/uploads\/2024\/09\/fotoermineia_4294-300x191.jpg 300w\" sizes=\"auto, (max-width: 580px) 100vw, 580px\" \/><\/figure>\n<\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:10%\"><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-715f7486\">\n<ul>\n<li><strong><u>CADASTRAL SURVEYING \u2013 HYDROGRAPHY<\/u><\/strong><\/li>\n<\/ul>\n<p>We develop Cadastral Surveys for large areas of public or private interest, aimed at creating a baseline for the execution of major engineering projects (roadworks, wind farms, hotel units, coastal facilities, port works, etc.).<br \/>We also possess the experience and expertise for the successful execution of hydrographic surveys.<\/p>\n<ul>\n<li><strong><u>COASTLINE \u2013 BEACH<\/u><\/strong><\/li>\n<\/ul>\n<p>We undertake the preparation of a Topographic Diagram for a coastal area and the application of the boundary line of the Coastline and the beach for the delineation of the property.<\/p>\n<ul>\n<li value=\"5\"><strong><u>DISTRIBUTION OF LAND \u2013 SUBDIVISION OF PROPERTY<\/u><\/strong><\/li>\n<\/ul>\n<p>The distribution of land and the subdivision of property, which is validated by a notarial act, requires the preparation of a topographic study leading to the drafting of a topographic diagram that illustrates the new properties.<br \/>The correct application of zoning legislation and the comprehensive assessment of all factors affecting the property is a critical element, so that the optimal feasible and urbanistically viable solution can be realized, which will increase the overall value of the land\/property after its distribution\/subdivision.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-separator uagb-block-0cfbb4b2 wp-block-uagb-separator--icon\"><div class=\"uagb-separator-spacing-wrapper\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><div class=\"wp-block-uagb-separator-element\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path d=\"M380.6 365.6C401.1 379.9 416 404.3 416 432C416 476.2 380.2 512 336 512C291.8 512 256 476.2 256 432C256 423.6 257.3 415.4 259.7 407.8L114.1 280.4C103.8 285.3 92.21 288 80 288C35.82 288 0 252.2 0 208C0 163.8 35.82 128 80 128C101.9 128 121.7 136.8 136.2 151.1L320 77.52C321.3 34.48 356.6 0 400 0C444.2 0 480 35.82 480 80C480 117.9 453.7 149.6 418.4 157.9L380.6 365.6zM156.3 232.2L301.9 359.6C306.9 357.3 312.1 355.4 317.6 354.1L355.4 146.4C351.2 143.6 347.4 140.4 343.8 136.9L159.1 210.5C159.7 218 158.5 225.3 156.3 232.2V232.2z\"><\/path><\/svg><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-info-box uagb-block-37c4d104 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top wp-block-uagb-info-box--has-margin\"><div class=\"uagb-infobox-margin-wrapper\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h1 class=\"uagb-ifb-title-prefix\">03<\/h1><h2 class=\"uagb-ifb-title\">FOREST MAPS<\/h2><\/div><\/div><\/div><\/div>\n\n\n\n<ul>\n<li value=\"5\"><strong>MONITORING OF FOREST MAP PUBLICATION<\/strong><\/li>\n<li value=\"5\"><strong>SUPPORT FOR THE SUBMISSION OF OBJECTIONS \/ APPEALS<\/strong><\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-uagb-separator uagb-block-81d3ccab wp-block-uagb-separator--icon\"><div class=\"uagb-separator-spacing-wrapper\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><div class=\"wp-block-uagb-separator-element\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path d=\"M380.6 365.6C401.1 379.9 416 404.3 416 432C416 476.2 380.2 512 336 512C291.8 512 256 476.2 256 432C256 423.6 257.3 415.4 259.7 407.8L114.1 280.4C103.8 285.3 92.21 288 80 288C35.82 288 0 252.2 0 208C0 163.8 35.82 128 80 128C101.9 128 121.7 136.8 136.2 151.1L320 77.52C321.3 34.48 356.6 0 400 0C444.2 0 480 35.82 480 80C480 117.9 453.7 149.6 418.4 157.9L380.6 365.6zM156.3 232.2L301.9 359.6C306.9 357.3 312.1 355.4 317.6 354.1L355.4 146.4C351.2 143.6 347.4 140.4 343.8 136.9L159.1 210.5C159.7 218 158.5 225.3 156.3 232.2V232.2z\"><\/path><\/svg><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-info-box uagb-block-c7c7ad46 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top wp-block-uagb-info-box--has-margin\"><div class=\"uagb-infobox-margin-wrapper\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h1 class=\"uagb-ifb-title-prefix\">04<\/h1><h2 class=\"uagb-ifb-title\">URBAN PLANNING ISSUES &#8211; PROPERTY CERTIFICATES<\/h2><\/div><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-9b9d00c8\">\n<ul>\n<li value=\"5\"><strong><u>CERTIFICATE OF ENGINEER<\/u><\/strong><\/li>\n<\/ul>\n<div>In every legal transaction inter vivos, including donations mortis causa, that involves <strong>the transfer<\/strong> <strong>or establishment of a real right in real estate or in property without buildings,<\/strong> a responsible declaration by the owner and a certificate from the engineer are required. The aforementioned responsible declaration by the owner and the engineer\u2019s certificate are also required for the registration of a final court decision regarding a declaratory action of ownership of the property and for the registration of the minutes of a judicial or extrajudicial settlement recognizing ownership of the property.<\/p>\n<p>With the above-mentioned responsible declaration by the owner and the engineer&#8217;s certificate, it is declared and certified respectively that:<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-uagb-container uagb-block-448d27a7\">\n<div class=\"wp-block-uagb-container uagb-block-5656805f\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>a) there are no buildings on the property or<\/p>\n<p>b) on the property or in the distinct autonomous horizontal or vertical property, excluding the common shared areas of the property, no unauthorized constructions have been executed beyond the allowed building density, coverage, and height of the property, and that no uses have been established without authorization or,<\/p>\n<p>c) the existing unauthorized constructions or the established unauthorized uses fall under one of the exceptions of paragraph 2 of Article 82 and are not subject to any other cases outlined in Article 89 of Law 4495\/2017.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-uagb-image uagb-block-db7b95c4 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/pistopoiitikomich_3535.jpg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/pistopoiitikomich_3535.jpg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/pistopoiitikomich_3535.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/pistopoiitikomich_3535.jpg\" alt=\"\" class=\"uag-image-1897\" width=\"580\" height=\"362\" title=\"pistopoiitikomich_3535\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-b45ae704\">\n<ul>\n<li value=\"5\"><strong><u>REGULARIZATION OF ILLEGAL CONSTRUCTIONS<\/u><\/strong><\/li>\n<\/ul>\n<div>In the event that urban planning violations are detected during the inspection for the issuance of an engineer&#8217;s certificate, we promptly and economically undertake the immediate regularization through the provisions of the currently applicable legislation, so that you can immediately carry out any transfer act you desire and be exempted from potential fines for the construction and maintenance of illegal structures or changes in usage.<\/div>\n<ul>\n<li value=\"5\"><strong><u>ENERGY PERFORMANCE CERTIFICATE<\/u><\/strong><\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<div class=\"wp-block-uagb-container uagb-block-9d8b1539\">\n<div class=\"wp-block-uagb-container uagb-block-77a379c8\">\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-uagb-image uagb-block-e8f4bb8a wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/energycertificate_energei_4360.jpg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/energycertificate_energei_4360.jpg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/energycertificate_energei_4360.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/energycertificate_energei_4360.jpg\" alt=\"\" class=\"uag-image-1898\" width=\"580\" height=\"362\" title=\"energycertificate_energei_4360\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>The Energy Performance Certificate (EPC) illustrates the energy classification of a property. The EPC includes, among other things, the general characteristics of the property, the estimated annual total primary energy consumption of the reference building and the examined building, the annual energy consumption per energy source and final use, the actual annual total final energy consumption, the estimated and actual annual carbon dioxide emissions, as well as recommendations for improving the energy efficiency of the building.<\/p>\n<p>The EPC is mandatory for every lease or sale of property and is valid for ten years, except in the case of a major renovation of the property, in which case its validity ends upon the completion of the renovation works and a new one must be issued.<\/p>\n<p>At EUROENGINEERING, we undertake the issuance of the EPC for your property swiftly and economically.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-separator uagb-block-5c297b1d wp-block-uagb-separator--icon\"><div class=\"uagb-separator-spacing-wrapper\"><div class=\"wp-block-uagb-separator__inner\" style=\"--my-background-image:\"><div class=\"wp-block-uagb-separator-element\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path d=\"M380.6 365.6C401.1 379.9 416 404.3 416 432C416 476.2 380.2 512 336 512C291.8 512 256 476.2 256 432C256 423.6 257.3 415.4 259.7 407.8L114.1 280.4C103.8 285.3 92.21 288 80 288C35.82 288 0 252.2 0 208C0 163.8 35.82 128 80 128C101.9 128 121.7 136.8 136.2 151.1L320 77.52C321.3 34.48 356.6 0 400 0C444.2 0 480 35.82 480 80C480 117.9 453.7 149.6 418.4 157.9L380.6 365.6zM156.3 232.2L301.9 359.6C306.9 357.3 312.1 355.4 317.6 354.1L355.4 146.4C351.2 143.6 347.4 140.4 343.8 136.9L159.1 210.5C159.7 218 158.5 225.3 156.3 232.2V232.2z\"><\/path><\/svg><\/div><\/div><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-623363c6 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-info-box uagb-block-3801b6ed uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h1 class=\"uagb-ifb-title-prefix\">05<\/h1><h2 class=\"uagb-ifb-title\">REAL ESTATE<\/h2><\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-e91230d3\">\n<div class=\"wp-block-uagb-container uagb-block-b46395ef\">\n<div class=\"wp-block-uagb-image alignleft uagb-block-4ff9da3f wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-left\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/axiaakinitou2_1452.jpg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/axiaakinitou2_1452.jpg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/axiaakinitou2_1452.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/axiaakinitou2_1452.jpg\" alt=\"\" class=\"uag-image-1902\" width=\"560\" height=\"500\" title=\"axiaakinitou(2)_1452\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-7621abb2\">\n<div class=\"wp-block-uagb-info-box uagb-block-f3d2d6b2 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h3 class=\"uagb-ifb-title\"><strong>Property Valuation<\/strong><br><\/h3><\/div><p class=\"uagb-ifb-desc\">Accurate and reliable assessment of the monetary value of a property. <br>Our experienced appraisers utilize modern methods and market data to determine the value of residential, commercial, and agricultural properties.<\/p><\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-3893b8aa\">\n<div class=\"wp-block-uagb-container uagb-block-b02b419f\">\n<div class=\"wp-block-uagb-image alignright uagb-block-2622f629 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-right\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/bigstock-architecture-engineerin_8647.jpg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/bigstock-architecture-engineerin_8647.jpg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/bigstock-architecture-engineerin_8647.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/bigstock-architecture-engineerin_8647.jpg\" alt=\"\" class=\"uag-image-1903\" width=\"560\" height=\"500\" title=\"bigstock-architecture-engineerin_8647\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-862a6668\">\n<div class=\"wp-block-uagb-info-box uagb-block-411c16f4 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h3 class=\"uagb-ifb-title\"><strong>Feasibility Study<\/strong><\/h3><\/div><p class=\"uagb-ifb-desc\">The feasibility study service provides a comprehensive analysis of the potential of a property or space, aiming for optimal utilization. Our experts assess factors such as location, infrastructure, legal regulations, and market trends, proposing strategies that maximize the value and efficiency of the property.<\/p><\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-64c2a67e\">\n<div class=\"wp-block-uagb-container uagb-block-3fbfeeed\">\n<div class=\"wp-block-uagb-image alignleft uagb-block-5517d747 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-left\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/anakainisilarge_1244.jpg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/anakainisilarge_1244.jpg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/anakainisilarge_1244.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/anakainisilarge_1244.jpg\" alt=\"\" class=\"uag-image-1905\" width=\"560\" height=\"500\" title=\"anakainisi(large)_1244\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-4906a1e2\">\n<div class=\"wp-block-uagb-info-box uagb-block-b2c48bb3 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h3 class=\"uagb-ifb-title\"><strong>Renovation<\/strong><\/h3><\/div><p class=\"uagb-ifb-desc\">The renovation service offers comprehensive solutions for the upgrading and modernization of your spaces. Whether it is for residential or commercial space, our team specializes in creating functional and aesthetically pleasing environments that meet modern demands.<\/p><\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-c9b514b2\">\n<div class=\"wp-block-uagb-container uagb-block-c7bb4fe7\">\n<div class=\"wp-block-uagb-image alignright uagb-block-0c6e34c2 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-right\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/oikodomikiadeia.j_6903.jpg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/oikodomikiadeia.j_6903.jpg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/oikodomikiadeia.j_6903.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/oikodomikiadeia.j_6903.jpg\" alt=\"\" class=\"uag-image-1906\" width=\"560\" height=\"500\" title=\"oikodomikiadeia.j_6903\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-6d10d66b\">\n<div class=\"wp-block-uagb-info-box uagb-block-f1e9b745 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h3 class=\"uagb-ifb-title\"><strong>Building Permit<\/strong><\/h3><\/div><p class=\"uagb-ifb-desc\">The building permit issuance service facilitates the licensing process for construction projects, ensuring that your work complies with regulations and legislative standards. Our team undertakes all necessary procedures, from the preparation of required documents to the submission of applications to the relevant authorities.<\/p><\/div><\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-407e9912 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-testimonial uagb-slick-carousel uagb-tm__arrow-outside uagb-block-63d6bdbb uagb-post__carousel_notset uagb-post__carousel_notset-tablet uagb-post__carousel_notset-mobile\"><div class=\"is-carousel uagb-tm__columns-1 uagb-tm__items\"><div class=\"uagb-testimonial__wrap  uagb-tm__imgicon-style-circle uagb-tm__image-position-top uagb-tm__bg-type-none \"><div class=\"uagb-tm__content\"><div class=\"uagb-tm__overlay\"><\/div><div class=\"uagb-tm__image-content\"><div class=\"uagb-tm__image\"><img decoding=\"async\" class=\"uagb-tm-img-src\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2023\/08\/testimonial-skip-02.jpeg\" alt=\"\" width=\"60\" height=\"60\" loading=\"lazy\"\/><\/div><\/div><div class=\"uagb-tm__text-wrap\"><div class=\"uagb-tm__desc\">The support I received from EUROENGINEERING was exceptional. They helped me quickly resolve my issues with the land registry.<\/div><div class=\"uagb-tm__meta-inner\"><div class=\"uagb-testimonial-details\"><span class=\"uagb-tm__author-name\">Maria Papadopoulou<\/span><span class=\"uagb-tm__company\"><\/span><\/div><\/div><\/div><\/div><\/div><\/div><\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-c6476a98 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-container uagb-block-499f3e2a\">\n<div class=\"wp-block-uagb-advanced-heading uagb-block-6fe09642\"><h2 class=\"uagb-heading-text\">Why Choose <br>EUROENGINEERING;<\/h2><\/div>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-72279faa\"><p class=\"uagb-heading-text\">We offer specialized services aimed at providing you with the best support for land registry, always with affordable costs and high quality.<\/p><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-8c7963ad\">\n<div class=\"wp-block-uagb-container uagb-block-918d0378\">\n<div class=\"wp-block-uagb-image uagb-block-0a080123 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/various-road-development-road-plan-3662370.jpeg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/various-road-development-road-plan-3662370.jpeg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/various-road-development-road-plan-3662370.jpeg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/various-road-development-road-plan-3662370.jpeg\" alt=\"\" class=\"uag-image-1580\" width=\"560\" height=\"450\" title=\"\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-53687665\"><h3 class=\"uagb-heading-text\">Professionalism<\/h3><p class=\"uagb-desc-text\">Our team consists of experienced engineers and partner lawyers who ensure the proper management of your assets.<\/p><\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-a2b4d0ac\">\n<div class=\"wp-block-uagb-image alignleft uagb-block-7a16e14f wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-left\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" srcset=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/shallow-focus-photography-of-black-and-silver-compasses-on-top-of-map-1203808.jpeg ,https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/shallow-focus-photography-of-black-and-silver-compasses-on-top-of-map-1203808.jpeg 780w, https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/shallow-focus-photography-of-black-and-silver-compasses-on-top-of-map-1203808.jpeg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/www.euroengineering.net\/wp-content\/uploads\/2024\/09\/shallow-focus-photography-of-black-and-silver-compasses-on-top-of-map-1203808.jpeg\" alt=\"\" class=\"uag-image-1573\" width=\"560\" height=\"450\" title=\"\" loading=\"lazy\" role=\"img\"\/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-c5a580ac\"><h3 class=\"uagb-heading-text\">Affordable Prices<\/h3><p class=\"uagb-desc-text\">We offer the best prices on the market, ensuring that you can access high-quality services without incurring financial strain.<\/p><\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-c84325e4 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-info-box uagb-block-d8a09d88 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h2 class=\"uagb-ifb-title\">Insure your property<\/h2><\/div><p class=\"uagb-ifb-desc\">Contact us today to start the process of safely declaring and registering your properties. <br\/><\/p><div class=\"uagb-ifb-button-wrapper wp-block-button\"><a href=\"https:\/\/euroengineering.net\/en\/epikoinonia\/\" class=\"uagb-infobox-cta-link wp-block-button__link\" target=\"_self\" rel=\"noopener noreferrer\" onclick=\"return true;\"><span class=\"uagb-inline-editing\">Contact us<br\/><\/span><\/a><\/div><\/div><\/div>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Cadastral Services The irrevocable delimitation of forests and coastal areas will constitute the most significant barrier against encroachments and illegality. It constitutes an essential tool for the rational organization and development of the country. At the same time, the Cadastre records the location and geometric details of parcels of land (plots, agricultural lands, private pastures [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"disabled","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"enabled","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-2073","page","type-page","status-publish","hentry"],"aioseo_notices":[],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false},"uagb_author_info":{"display_name":"vg5rtwralnpp","author_link":"https:\/\/euroengineering.net\/en\/author\/vg5rtwralnpp\/"},"uagb_comment_info":0,"uagb_excerpt":"Cadastral Services The irrevocable delimitation of forests and coastal areas will constitute the most significant barrier against encroachments and illegality. It constitutes an essential tool for the rational organization and development of the country. At the same time, the Cadastre records the location and geometric details of parcels of land (plots, agricultural lands, private pastures&hellip;","_links":{"self":[{"href":"https:\/\/euroengineering.net\/en\/wp-json\/wp\/v2\/pages\/2073","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/euroengineering.net\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/euroengineering.net\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/euroengineering.net\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/euroengineering.net\/en\/wp-json\/wp\/v2\/comments?post=2073"}],"version-history":[{"count":8,"href":"https:\/\/euroengineering.net\/en\/wp-json\/wp\/v2\/pages\/2073\/revisions"}],"predecessor-version":[{"id":2153,"href":"https:\/\/euroengineering.net\/en\/wp-json\/wp\/v2\/pages\/2073\/revisions\/2153"}],"wp:attachment":[{"href":"https:\/\/euroengineering.net\/en\/wp-json\/wp\/v2\/media?parent=2073"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}